This non-standard, cold-forged carbon steel zinc-nickel alloy hexagonal self-tapping screw, featuring a black, enlarged washer, is a high-performance fastener. This detailed technical description of the surface treatment is organized by key points, balancing professionalism and practicality.

 

1. Substrate Pretreatment
Degreasing: Remove grease from the cold-forged surface using an alkaline solution (pH 10-12) at 60-80℃ for 5-10 minutes.

Acid Cleaning: Use hydrochloric acid or sulfuric acid for 1-3 minutes to avoid excessive corrosion.

Phosphating: A zinc phosphate coating (film weight 1.5-3.0 g/m²) improves the adhesion of subsequent coatings and is suitable for high-load applications.

20250714093439

2. Zinc-Nickel Alloy Electroplating Core Process
Bath formula: Zn²⁺ 8-12 g/L, Ni²⁺ 1-2 g/L (Zn-Ni ratio 12-15:1)

Alkaline system (pH 13-14), additives include a complexing agent (such as EDTA) and a brightener

Process parameters: Current density 2-4 A/dm², temperature 20-30℃, plating time 15-25 minutes. Cathode movement (frequency 15-20 times/minute) ensures uniformity.

Post-treatment: Three-stage countercurrent rinse → Passivation (trivalent chromium passivation, Cr³⁺ 0.5-1.0 g/L, pH 4.5-5.5) → Sealing (silane system)

3. Black Surface Treatment Options

Black passivation: Post-plating chromate conversion coating. Low cost but average wear resistance (salt spray 48 hours).

20250714093552

Organic Coating: Epoxy resin electrostatic spray coating, thickness 20-30μm, salt spray 500 hours or more.

Oxidation Blackening: Alkaline high-temperature oxidation, decorative only, no rust protection.

4. Key Performance Verification
Adhesion Test: Cross-cut test reaches Level 0, bend test (90℃) shows no peeling.

Corrosion Resistance: Neutral salt spray test for >1000 hours, no red rust (zinc-nickel alloy + sealant).

Friction Coefficient Control: Coated screws must maintain a coefficient of friction between 0.10 and 0.15.

6. Production Precautions
Hydrogen Embrittlement Risk: Dehydrogenation treatment at 200°C for 2 hours must be performed within 4 hours after electroplating (required for hardness >32 HRC).

202507140935522

<5ppm to prevent flaking).

This process chain design achieves high corrosion resistance (zinc-nickel alloy), decorative properties (matte black), and functionality (self-tapping and integrated washer), making it suitable for demanding environments such as automotive and photovoltaic mounting systems. In actual production, it is recommended to conduct a small batch test to verify the coating adhesion and thread fit accuracy.

जांच भेजें
हमसे संपर्क करेंअगर कोई सवाल है

आप या तो नीचे फोन, ईमेल या ऑनलाइन फॉर्म के माध्यम से हमसे संपर्क कर सकते हैं। हमारे विशेषज्ञ जल्द ही आपसे संपर्क करेंगे।

अभी संपर्क करें!